Engineered Precision, Delivered

OUR WORK

FINISHED WORK

Students studying and using microscopes in a sunlit exposed CLT Wood science classroom

FEATURED CASE STUDY

CORNERSPRING MONTESSORI

Montessori Middle School  |  Belfast, ME

3-DAY INSTALL | ALL-WOOD ASSEMBLY | PASSIVE HOUSE

Cross-laminated timber panels arrived with wood fiber insulation already installed, one all-wood system for structure and thermal performance. The shell went up in two days. The result is a Passive House school the University of Maine is monitoring for energy, thermal, and moisture performance.