Cornerspring
Montessori

Middle School Building Annex

Case Study  ·  Institutional / Educational  ·  CLT Prefab  ·  High-Performance

A High-performance CLT school assembled in three days

Cornerspring Montessori School had a clear goal: extend Montessori education to middle school-age students in the midcoast Maine community. What they needed was a building that could match that ambition — high-performance, sustainable, and completed without disrupting the existing school campus.

The result is a freestanding 1,000-square-foot building fabricated offsite at the NotchSB facility in Madison, Maine and assembled on Cornerspring's 35-acre Belfast campus in just 3 days. Structural panels arrived by truck and were craned into place by NotchSB's in-house installation crew — a construction timeline that would be impossible with conventional stick-frame methods.

Four children studying at two black-topped tables in a Montessori classroom with CLT wooden walls, large triple-pane window showing the outdoors, and microscopes on the tables.

Project Data

Client Cornerspring Montessori School
Location Belfast, Maine
Design Team OPAL Architecture
Builder / Fabricator NotchSB
Year Delivered 2021
Size 1,000 square feet
3 Days to install
50+ Building envelope sensors
All Wood
Construction

The NotchSB prefab panel system: structure, insulation, and finish in one assembly

The building employs the NotchSB all-wood prefabricated panel system — a construction approach that combines cross-laminated timber and wood fiber insulation in a single integrated assembly. Each panel provides structure, thermal insulation, and interior finish simultaneously, eliminating the layered coordination complexity of conventional construction.

Wood fiber insulation, such as TimberBoard from TimberHP, delivers high thermal performance and vapor management alongside the CLT structure. The result is a building envelope that outperforms stick-frame construction on airtightness, thermal bridging, and embodied carbon, while reducing total on-site construction time, site disturbance, and project carbon footprint.

Panel System

CLT structure + wood fiber insulation combined in prefabricated all-wood panels. Each panel delivers structure, thermal envelope, and interior finish in a single integrated assembly — eliminating the layered coordination of conventional construction.

Insulation Rigid Wood Fiber Insulation
Roof: R70
Wall: R40
Fabrication Offsite at NotchSB facility
Shell Installation Three-day onsite assembly
Biogenic Carbon Stored
(in CLT & Insulation)
57.8 metric tons CO₂e stored
(approx. 12 passenger vehicles' annual emissions)
Biogenic Carbon Stored
(in CLT & Insulation)
57.8 metric tons CO₂e stored
(approx. 12 passenger vehicles' annual emissions)

The Carbon Advantage

Loreum Ipsum

Carbon Advantage

Mass timber sequesters biogenic carbon. Wood fiber insulation adds further embodied carbon savings. Together they produce a building envelope with a significantly lower carbon footprint than steel or concrete alternatives.

From design spec to verified performance:

The Data Behind the Build

In partnership with building science researchers at the University of Maine, NotchSB instrumented the Cornerspring building envelope with more than 50 sensors tracking moisture and temperature performance through real Maine seasons.

The result: a long-term, real-world performance record that confirms the assembly performs as designed — turning engineering assumptions into verified data, and giving architects and developers a credible evidence base for evaluating mass timber construction.

The Results: High Performance, Low Risk. Learn more about our findings here [blog post].

50+ Building envelope sensors